By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
  • Business & Economy
    • Markets & Trade
    • Banking & Finance
  • Creative Economy
  • Agriculture
  • Technology
  • Policy
  • Energy
  • Opinion
  • Support XOL Africa
Reading: Lake Victoria Gold begins 6,500-metre drilling programme ahead of Tanzania mine development
Share
Notification Show More
Font ResizerAa
Font ResizerAa
  • Business & Economy
  • Creative Economy
  • Agriculture
  • Technology
  • Policy
  • Energy
  • Opinion
  • Support XOL Africa
Have an existing account? Sign In
Follow US
  • Advertise
Home » XOL » Lake Victoria Gold begins 6,500-metre drilling programme ahead of Tanzania mine development
Energy

Lake Victoria Gold begins 6,500-metre drilling programme ahead of Tanzania mine development

Canadian miner advances preparations for initial gold production at Imwelo as grade-control work and infrastructure development gather pace.

12 hours ago
4 Min Read
By
XOL Africa
Share
©Lake Victoria Gold
SHARE

Canada-listed Lake Victoria Gold has begun a 6,500-metre drilling programme at its Imwelo gold project in Tanzania, marking a shift from exploration towards operational planning as the company prepares for initial open-pit mining.

The programme, which started on November 4, targets Area C, the planned first mining zone at the fully permitted project, located near AngloGold Ashanti’s Geita gold mine in northwestern Tanzania.

In a statement released on Wednesday, November 11, Lake Victoria Gold said the reverse circulation drilling would provide detailed geological data to guide pit design, identify economically recoverable mineralisation and minimise waste extraction during the early stages of mining.

The company is drilling on a staggered 10-metre by 10-metre grid across the upper 20 metres of the proposed open pit. A second drilling rig is being mobilised, with completion scheduled for February 2027.

The programme represents a significant operational step for the TSX Venture Exchange-listed company, which is seeking to develop Imwelo into a producing gold asset within Tanzania’s established Lake Victoria goldfields.

Earlier drilling at Area C returned high-grade intersections, including 28.71 grammes of gold per tonne over 2.75 metres and 12.20 grammes per tonne over 4.5 metres.

Exploration work conducted between late 2025 and early 2026 also identified mineralisation extending more than 250 metres below the surface, beyond the current pit design, suggesting potential for future resource expansion.

The latest drilling campaign is intended to improve the accuracy of ore and waste separation, reduce dilution and refine mining schedules — factors that can materially influence operating costs and profitability.

“Commencing grade control drilling is an important milestone in Imwelo’s progression toward production,” said Marc Cernovitch, president and chief executive of Lake Victoria Gold.

“We are moving beyond defining mineralization and into the detailed preparation of the first mining benches.”

The company has also made progress on metallurgical testing, an important consideration for the project’s commercial viability.

Tests on transitional and fresh mineralisation achieved gold recoveries of approximately 96 to 97 per cent. Separate work on shallow, clay-rich material found that pretreatment increased 24-hour gold extraction from about 50 per cent to 84.5 per cent.

However, the company cautioned that these results do not represent overall plant recovery rates and that further optimisation remains necessary.

Infrastructure development is proceeding alongside drilling. Initial access-road repairs have been completed, construction of the site camp is substantially finished, and earthworks are continuing across planned mining facilities.

Lake Victoria Gold is developing Imwelo with support from Tanzania’s Taifa Group, whose subsidiary Taifa Mining is expected to undertake contract mining and civil works.

The involvement of the Tanzanian contractor provides the project with access to established local mining expertise and equipment as development advances.

Lake Victoria Gold also owns the nearby Tembo project, adjacent to Barrick’s Bulyanhulu mine, strengthening its exposure to one of Africa’s established gold-producing regions.

The company’s development plans nevertheless carry significant financial and technical risks.

Although Imwelo has previously undergone preliminary economic and pre-feasibility assessments under international reporting standards, Lake Victoria Gold said it has not completed a current feasibility study establishing mineral reserves under Canadian reporting requirements.

Consequently, any decision to begin production would carry greater uncertainty over economic viability, operating costs, metallurgical performance and funding requirements.

The company has not announced a definitive date for commercial production.

For Tanzania, the project’s progress adds to development activity in the country’s gold sector, although its eventual contribution to output, employment and investment will depend on successful mine commissioning and sustained commercial operations.

SUPPORT AFRICAN BUSINESS JOURNALISM

Help XOL Africa expand independent business reporting across Africa.

SUPPORT XOL AFRICA →
ExxonMobil CFO to Address Barclays Energy Conference as Investors Assess Strategy
Nigeria unveils tax reform targeting $50 billion in deep offshore oil investment
Nigeria makes deep offshore oil investment more attractive with new tax incentive rules
Tanzania nickel project review cuts Lifezone’s payment cap to BHP by $8m
AFC backs ₦728.9bn bond to tackle Nigeria’s power-sector debt
TAGGED:Lake Victoria GoldTanzania
Share This Article
Facebook LinkedIn Threads Bluesky Copy Link
Previous Article Germany pledges €500,000 to WTO fund as African economies seek stronger global trade access
Next Article Afreximbank commits $75 million to expand financing for Nigerian small businesses

Follow US

FacebookLike
XFollow
YoutubeSubscribe
LinkedInFollow

Weekly Newsletter

Subscribe to our newsletter!
Popular News
Business & Economy

Afreximbank commits $75 million to expand financing for Nigerian small businesses

XOL Africa
By
XOL Africa
11 hours ago
Germany pledges €500,000 to WTO fund as African economies seek stronger global trade access
South Africa’s Ramaphosa approves pay rises of up to 4% for politicians, judges and public officials
Senegal opens vocational training centres to equip 2,640 students annually with job-ready skills
Zambia pushes ahead with nuclear power plans to diversify energy supply
↗↙

Exchange & Finance

African Markets | Currency Exchange Rates

Loading exchange rates...

Connecting to exchange-rate provider...

Financial News

Business & Economy ↗ Markets & Trade ↗ Banking & Finance ↗
Indicative reference exchange rates from ExchangeRate-API. Rates may differ from bank, card and mobile-money rates.

XOL Africa is a Tallinn-based African magazine documenting the people, ideas, institutions, and events shaping Africa’s future.

  • About us
  • Contact us
  • Privacy Policy
  • Support XOL Africa

Follow us

Join Us!
Subscribe to our newsletter.
Zero spam, Unsubscribe at any time.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?